Blackstone 275kV Substation Project

Description

The works consisted of supplying and installing a new
pre-cast stormwater drainage system for the new substation location. Works also included tying the new stormwater system into the already existing one. IDC Contracting collaboratively worked in with other subcontractors on-site to ensure the stormwater system was kept live whilst the bulk earthworks were being advanced.

 

Project Features 

  • Supply and install over 550Lm of pre-cast stormwater drainage pipework. 

  • Supply and install 28 stormwater drainage structures including outlet structures. 

  • The works were required to be carried out in a restricted area with some work having to be performed in confined spaces. 

  • General Plant Hire to assist with other works on-site. 